Search

Engraving GDZ98x70-1.5kw Air-Cooled Spindle Motor Milling ER11 Chuck Square Spindle Flange For CNC Router Woodworking Engraving Accessories(1.5kw ER11 380V)

KWD 149.500

Brand
BERWENNY
Category
Sanders
Weight
499 g
Color1.5kw Er11 380v
All electronics ship with US style plugs. You may need a voltage converter or a plug adapter.
1 +

Special Features

  • Speed regulation mode: change the spindle speed through the three-phase output inverter and adjust the frequency of the inverter.
  • Cooling method: air cooling
  • Power interface: optional 6-pin waterproof air connector.
  • The air connectors are marked with "1", "2", "3", "4", "5", and "GND".
  • "1", "2", and "3" are respectively connected to the inverter (U, V, W), and "GND" is connected to the inverter ground.

Description

Size: GDZ98x70-1.5
Power: 1.5kw
Voltage: 220V/380V
Current: 8.0A
Frequency: 0-400Hz
Speed: 0-24000rpm
Runout: less than 0.01mm
4 fully sealed angular contact bearings
Chuck: ER11
Clamping tool diameter:7mm, 6.5mm, 6.35mm, 6mm, 5.5mm, 5mm, 4.5mm, 4mm, 3.5mm 3.175mm, 3.0mm, 2.5mm, 2mm, 1.5mm, 1mm (standard 4mm)
Water-cooled ER11 chuck
Grease lubrication

The working environment temperature of the spindle is usually -10~40.
Before installing the first electric spindle to rotate the spindle head by hand, you should feel flexibility and no blockage.
P4 fully sealed angular joint bearings can extend the life of the spindle.
The longer the length, the greater the torque and the greater the power.
Careful assembly makes the spindle more precise.
The accuracy is 0.01mm, and the coaxial cable is less than 0.0025mm
1. Our main shaft uses 4 bearings.
2. Bearings are to high temperature and low heat
3. The ball bearing has low friction, low noise and long service life.
When the spindle is stored and transported, the bearing condition inside the high-speed grease will change, and the customer should run it at low speed for 30 minutes.
Then increase slowly at a speed of 3000 rpm, running for 20 minutes each time.
The spindle and inverter should work together.
The specifications and parameter sets of the inverter match the spindle parameters.
To connect the inverter main shaft, the three-phase inverter power cord should be welded to the connector 1 (U), 2 (V), 3 (W) pin, and the grounded pin 4.
After turning on the power, observe whether the spindle rotation axis always shows the direction.
If it is inconsistent, turn it off immediately, and replace the two wires of the three-phase power supply connected to the inverter and the spindle.
Before using the spindle every day, it must run at low speed for 15-20 minutes.
Clamp the cutter on the spindle, the chuck

Related Items


{"error":"Error","cart_limit":"You have too many items in your cart.","prod_limit":"You cannot add any more of this item"}