بحث

1.5kW 380V شفة

KWD 172.500

ماركة
BERWENNY
فئة
ساندرز
وزن
499 g
اللون1.5kW 380V شفة
الاجهزه الالكترونيات الامريكية قد تحتاج الى محمول فولت من ١١٠ الى ٢٢٠. قد تحتاج إلى محول كهرباء
1 +

مميزات خاصة

  • Speed regulation mode: change the spindle speed through the three-phase output inverter and adjust the frequency of the inverter.
  • Cooling method: air cooling
  • Power interface: optional 5-pin waterproof aviation connector.
  • Aviation connectors are marked with "1", "2", "3", "4", "5", "GND".
  • "1", "2", and " 3" are connected to the inverter (U, V, W), and "GND" is connected to the inverter ground. )

وصف

Model: Model: GDZ93-82-1.5
Power: 1.5kw (1hp=0.735w)
Voltage: 380v (please leave a message if you need a 220v spindle, thank you)
Current: 3.8A
Frequency: 300-400Hz
Speed: 18000-24000rpm
Jump close: less than 0.01mm
Shaft end connection: ER20-3.175-6
Bearing type: 2*7005C P4, 2*7002C P4 (4 ball bearings)
Grease lubrication

The working environment temperature of the spindle is usually -10~40.
Before installing the first electric spindle to rotate the spindle head by hand, you should feel flexibility and no blockage.
P4 fully sealed angular joint bearings can extend the life of the spindle.
The longer the length, the greater the torque and the greater the power.
Careful assembly makes the spindle more precise.
The accuracy is 0.01mm, and the coaxial cable is less than 0.0025mm
1. Our main shaft uses 4 bearings.
2. Bearings are resistant to high temperature and low heat
3. The ball bearing has low friction, low noise and long service life.
5. Pins Air connector: No.1,2,3 connecting to Inverter U,V,w. Spindle Gnd connecting to Inverter Gnd.
ER20 Collet Nut balancing nut high grinding inner cone precision 0.01mm.
When the spindle is stored and transported, the bearing condition inside the high-speed grease will change, and the customer should run it at low speed for 30 minutes.
Then increase slowly at a speed of 3000 rpm, running for 20 minutes each time.
The spindle and inverter should work together.
The specifications and parameter sets of the inverter match the spindle parameters.
To connect the inverter main shaft, the three-phase inverter power cord should be welded to the connector 1 (U), 2 (V), 3 (W) pin, and the grounded pin 4.
After turning on the power, observe whether the spindle rotation axis always shows the direction.
If it is inconsistent, turn it off immediately, and replace the two wires of the three-phase power supply connected to the in

منتجات شبيهه


{"error":"\u062e\u0637\u0623","cart_limit":"\u0644\u062f\u064a\u0643 \u0627\u0644\u0643\u062b\u064a\u0631 \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0633\u0644\u0629 \u0627\u0644\u062a\u0633\u0648\u0642 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643.","prod_limit":"\u0644\u0627 \u064a\u0645\u0643\u0646\u0643 \u0625\u0636\u0627\u0641\u0629 \u0627\u0644\u0645\u0632\u064a\u062f \u0645\u0646 \u0647\u0630\u0627 \u0627\u0644\u0645\u0646\u062a\u062c"}