بحث

بيت / Knvieeu / أطواق الكلاب والأحزمة والمقاود
GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… in Kuwait

GPS Tracker for Dogs, Smart Dog Tracker with Real-Time Location, for Android and iPhone No Monthly Fee & No SIM Card- Pet Location Tracker with Holder, IP68 Waterproof, Indoor &… Black

KWD 9.500

اللونأسود
– 1 +

مميزات خاصة

  • 【GPS Tracker for Dogs | No Monthly Fee & No SIM Card with Android & iPhone】This dog tracker has no recurring subscriptions, no SIM card requirements, and no activation fees for core tracking functions. It is fully compatible with Android and iPhone devices, pairs seamlessly with the free DEONETAG app, and offers intuitive one-click pairing, stable connection, and simple setup for reliable daily pet location monitoring. This pet tracker for dogs is friendly for all new and experienced pet owners.
  • 【Real-Time Location Tracking & 7-Day Historical Route Playback】This premium GPS tracker for dogs supports stable real-time location tracking, with remote viewing available anytime through the DEONETAG app, whether you're at work, running errands, or away from home. It also records and plays back up to 7 days of your pet's movement history, clearly showing travel routes and activity ranges to help you understand your pet's daily routines and outdoor habits.
  • 【IP68 Waterproof & Lightweight Dog Tracker Tag for All Daily Scenarios】This durable dog tracker tag features a professional IP68 waterproof rating, fully withstanding rain, snow, water splashes, and accidental brief submersion, with no risk of damage from your pet's water play or harsh outdoor weather. Its ultra-slim, lightweight body adds no extra burden to your pet, and fits firmly on most standard pet collars for small, medium and large dog breeds.
  • 【Compact Design with Dedicated Holder for Secure & Versatile Attachment】This compact pet tracker for dogs comes with a custom dedicated holder for quick, tool-free installation, ensuring a tight, wobble-free fit on your pet's collar in seconds. It stays securely attached even during high-energy running, jumping, and outdoor exploration, and can also be fixed to backpacks, luggage, or other items for flexible multi-scene tracking use.
  • 【QR Code Path Sharing | Secure Stable Connection & Pet-Safe Design】Through the free DEONETAG app, you can generate an encrypted QR code for this dog tracker; others can share your pet's real-time path and location with one scan of the owner-provided QR code, no complex setup needed. This pet tracker for dogs uses encrypted secure links to protect data privacy, with stable uninterrupted connection. Made of non-irritating pet-safe material , it causes no harm to your pet for long-term daily wear.

منتجات شبيهه


{"error":"\u062e\u0637\u0623","cart_limit":"\u0644\u062f\u064a\u0643 \u0627\u0644\u0643\u062b\u064a\u0631 \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0633\u0644\u0629 \u0627\u0644\u062a\u0633\u0648\u0642 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643.","prod_limit":"\u0644\u0627 \u064a\u0645\u0643\u0646\u0643 \u0625\u0636\u0627\u0641\u0629 \u0627\u0644\u0645\u0632\u064a\u062f \u0645\u0646 \u0647\u0630\u0627 \u0627\u0644\u0645\u0646\u062a\u062c"}