الطول l1: 64 ملم
- وزن
- 80 g
- Availability
- In stock
مقاسالطول l1: 64 ملم
مميزات خاصة
- Handle diameter d1: 8 mm; hole spacing l: 55 mm; handle height h: 35 mm; thread d2: M4
- Box contents: 2 handles
- Chrome-plated steel
- Plates: die-cast zinc, nickel-plated
- RoHS Compliant
وصف
Ganter Standard Elements | Handles??-??GN 425; Diameter: 8??mm Chrome-Plated Steel Pack of 2, Silver, GN 425-8-55-CR
{"error":"\u062e\u0637\u0623","cart_limit":"\u0644\u062f\u064a\u0643 \u0627\u0644\u0643\u062b\u064a\u0631 \u0645\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0641\u064a \u0633\u0644\u0629 \u0627\u0644\u062a\u0633\u0648\u0642 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643.","prod_limit":"\u0644\u0627 \u064a\u0645\u0643\u0646\u0643 \u0625\u0636\u0627\u0641\u0629 \u0627\u0644\u0645\u0632\u064a\u062f \u0645\u0646 \u0647\u0630\u0627 \u0627\u0644\u0645\u0646\u062a\u062c"}